For a project consisting of 5 miles stretch of highway construction, among many activities, one can identify the following tasks. Please list all tasks, including a few more that you suggest to be performed in an acceptable sequence of events: a. Initial surveysb. Gradingc. Build foundations, storm water drainaged. Curbse. Compaction of soilsf. Base Gravel & compactiong. Asphalt baseh. Pavement asphalt layeri. Signagej. Approvalsk. Designs Considering the fact that, as a PM, you do not need to wait for a particular task to be completed, which might last during the entire length of highway, to start the next task (or have multiple crews designated to do the same task at different parts of the roadway), please draw the best Gantt Chart for all tasks involved, to be listed in a proper sequence, including many other important tasks that may not be listed above, using your own best estimates for the duration, and show where do you set your milestones/ control measures and on what elements/tasks in order to reduce cost-overruns?
Use the order calculator below and get started! Contact our live support team for any assistance or inquiry.
[order_calculator]